offers
Inhalte von Youtube werden aufgrund deiner aktuellen Cookie-Einstellungen nicht angezeigt. Klicke auf “Zustimmen & anzeigen”, um zuzustimmen, dass die erforderlichen Daten an Youtube weitergeleitet werden, und den Inhalt anzusehen. Mehr dazu erfährst du in unserer Datenschutz. Du kannst deine Zustimmung jederzeit widerrufen. Gehe dazu einfach in deine eigenen Cookie-Einstellungen.
fire protection:
- Concept development and assessment of preventive fire protection measures
- Evaluation of organizational fire protection (escape routes / rescue plans)
- Supervision of the observance / execution of structural (e.g. sealing off fire compartments and closing off installation openings) and technical fire protection (e.g. sprinkler systems, fire alarm systems)
thermography, building physics
- Measurement of surface temperatures with an infrared camera
- Creation of thermal image photographs (infrared images)
- Quality assurance and control of the execution
- Early detection of optically not yet visible damages such as mould, mould stains, energy loss, moisture and undefined air leakage in the facade
- Defects in sewer and pipe systems, electrical system components and leaks in the roof construction
- Simulation of state variables such as temperatures and relative humidity and display as IFR image
- Moisture measurements
Construction supervision according to HOAI work phase 8
- Organization
- Cost monitoring
- deadline monitoring
- Controlling
Consulting and planning
in the specialist areas: architecture, civil engineering, technical Building services, supply engineering
according to Section 3 Engineering Structures HOAI and Section 2 Technical Equipment HOAI
- Preliminary planning
- Draft
- Approval planning
- Cost Planning
- Scheduling
- Implementation plans
- Tender
- Redevelopment planning
Value assessment reports e.g. for new purchases, debt rescheduling, auction
- Local appointment
- Review of construction and revision documents and expert opinions
- Inspection and assessment of buildings and outdoor facilities
- Determination of land, material and market value
Damage report
e.g. water damage, moisture damage (sponge, mold), energy loss and facade damage
- Determination of defects
- Cause search
- Damage assessment
- Expert opinion
- Expert advice for processes
Expert opinions on the renovation of old buildings
- Local appointment
- Review of construction and revision documents and expert opinions
- Inspection and assessment of buildings and outdoor facilities
- Renovation cost estimate
- Remediation recommendations
- Profitability analysis